Ahli Madya Teknik Jalan 114 (#9)
Jenis Skema :
Jenjang (Level) : 8
Associate Expert in Road Engineering (Code : #9)
Unit Kompetensi:
Kode Unit : F.42ATJ00.001.2
Mengendalikan Pekerjaan Survei Pendahuluan (Reconnaissance Survey)
Controlling Preliminary Survey Work (Reconnaissance Survey)
Kode Unit : F.42ATJ00.002.2
Melaksanakan Pekerjaan Pengumpulan Data
Carrying out Data Collection Work
Kode Unit : F.42ATJ00.003.2
Melaksanakan Studi Kelaikan dan Lingkungan
Conducting Feasibility and Environmental Studies
Kode Unit : F.42ATJ00.004.2
Melaksanakan Pekerjaan Perencanaan Geometrik Jalan
Carrying out Road Geometric Planning Work
Kode Unit : F.42ATJ00.005.2
Melaksanakan Pekerjaan Rekayasa Lalu Lintas
Carrying out Traffic Engineering Work
Kode Unit : F.42ATJ00.006.2
Melaksanakan Pekerjaan Rekayasa Geoteknik
Carrying out Geotechnical Engineering Works
Kode Unit : F.42ATJ00.007.2
Melaksanakan Pekerjaan Perencanaan Perkerasan Jalan
Carrying out Road Paving Planning Work
Kode Unit : F.42ATJ00.008.2
Melaksanakan Pekerjaan Perencanaan Drainase
Carrying out Drainage Planning Work
Kode Unit : F.42ATJ00.009.2
Melaksanakan Pekerjaan Perencanaan Dinding Penahan Tanah dan Dinding Pelindung Lereng
Carrying out the work of planning retaining walls and slope protection walls
Kode Unit : F.42ATJ00.010.2
Melaksanakan Pekerjaan Perencanaan Bangunan Pelengkap Jalan
Carrying out Road Complementary Building Planning Work
Kode Unit : F.42ATJ00.011.2
Menyiapkan Dokumen Pengadaan
Preparing Procurement Documents
Kode Unit : F.42ATJ00.012.2
Melakukan Pelaksanaan Pekerjaan Persiapan Konstruksi Jalan
Carrying out Road Construction Preparation Work
Kode Unit : F.42ATJ00.013.2
Melaksanakan Kegiatan Administrasi Pelaksanaan Konstruksi Jalan
Carrying out Road Construction Administration Activities
Kode Unit : F.42ATJ00.014.2
Melaksanakan Pekerjaan Drainase
Carrying out Drainage Work
Kode Unit : F.42ATJ00.015.2
Melaksanakan Pekerjaan Tanah dan Geosintetik
Carrying out Earthworks and Geosynthetics
Kode Unit : F.42ATJ00.016.2
Melaksanakan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton Semen
Carrying out Granular Pavement and Cement Concrete Pavement Works
Kode Unit : F.42ATJ00.017.2
Melaksanakan Pekerjaan Perkerasan Aspal (Flexible Pavement)
Carrying out Asphalt Pavement Work (Flexible Pavement)
Kode Unit : F.42ATJ00.018.2
Melakukan Pekerjaan Preventif Pelaksanaan Pekerjaan Jalan
Carrying out Preventive Work on Road Works
Kode Unit : F.42ATJ00.019.2
Melaksanakan Pekerjaan Struktur Jalan
Carrying out Road Structure Work
Kode Unit : F.42ATJ00.020.2
Melaksanakan Pekerjaan Harian dan Pekerjaan Lain-lain
Carrying out Daily Work and Other Work
Kode Unit : F.42ATJ00.021.2
Melakukan Pengawasan Kegiatan Pekerjaan Persiapan Konstruksi Jalan
Supervising Road Construction Preparation Work Activities
Kode Unit : F.42ATJ00.022.2
Melaksanakan Pengawasan Kegiatan Administrasi Konstruksi Jalan
Carrying out Supervision of Road Construction Administration Activities
Kode Unit : F.42ATJ00.023.2
Melaksanakan Pengawasan Pekerjaan Drainase
Carrying out Supervision of Drainage Work
Kode Unit : F.42ATJ00.024.2
Mengawasi Pelaksanaan Pekerjaan Tanah dan Geosintetik
Supervising the Implementation of Earthworks and Geosynthetics
Kode Unit : F.42ATJ00.025.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton Semen
Carrying out Supervision of Granular Pavement and Cement Concrete Pavement Work
Kode Unit : F.42ATJ00.026.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Aspal (Flexible Pavement)
Carrying out Supervision of Asphalt Pavement Work (Flexible Pavement)
Kode Unit : F.42ATJ00.027.2
Mengawasi Pelaksanaan Pekerjaan Preventif Pekerjaan Jalan
Supervising the Implementation of Preventive Work on Road Works
Kode Unit : F.42ATJ00.028.2
Melaksanakan Pengawasan Pekerjaan Struktur Jalan
Carrying out Supervision of Road Structure Work
Kode Unit : F.42ATJ00.029.2
Mengawasi Pekerjaan Harian dan Pekerjaan lain lain
Supervise Daily Work and Other Work