Skema Kompetensi

LSP Konstruksi Asttatindo

Ahli Utama Teknik Dermaga 114 (#22)

Jenis Skema :
Jenjang (Level) : 9

Lead Expert in Pier Engineering (Code : #22)

Unit Kompetensi:

Kode Unit : F.429120.001.01
Menerapkan Komunikasi di Tempat Kerja
Implementing Communication in the Workplace

Kode Unit : F.429120.002.01
Menyiapkan Data Sekunder yang Terkait dengan Perencanaan Dermaga
Preparing Secondary Data Related to Pier Planning

Kode Unit : F.429120.003.01
Melaksanakan Survei Hidro-oceanografi dan Topografi
Conducting Hydro-oceanographic and Topographic Surveys

Kode Unit : F.429120.004.01
Mendesain Lay Out Dermaga
Designing the Pier Layout

Kode Unit : F.429120.005.01
Melaksanakan Survei Penyelidikan Tanah
Conducting a Land Survey

Kode Unit : F.429120.006.01
Mengkaji Hasil Perencanaan Pendahuluan Dermaga
Reviewing Planning Results Pier Introduction

Kode Unit : F.429120.007.01
Melaksanakan Pekerjaan Persiapan Perencanaan Detail Dermaga
Carrying out Preparatory Work Detailed Pier Planning

Kode Unit : F.429120.008.01
Melakukan Perhitungan Detail Desain Struktur Dermaga
Performing Detailed Design Calculations for the Pier Structure

Kode Unit : F.429120.009.01
Mengkaji Hasil Perhitungan Struktur Dermaga
Reviewing the Results of the Pier Structural Calculations

Kode Unit : F.429120.010.01
Membuat Gambar Rencana Dermaga
Creating a Pier Plan Drawing

Kode Unit : F.429120.011.01
Membuat Desain Final Dermaga
Creating the Final Pier Design

Kode Unit : F.429120.012.01
Mengkaji Gambar Detail dan Pembuatan Desain Final Konstruksi Dermaga
Reviewing Detailed Drawings and Creating the Final Design for the Pier Construction

Kode Unit : F.429120.013.01
Membuat Laporan dan Dokumentasi Pekerjaan
Creating Reports and Documentation Work

Kode Unit : F.429120.014.01
Melaksanakan Pekerjaan K3LM (K3, Lingkungan dan Sistem Manajemen Mutu)
Implementing K3LM (K3, Environment, and Quality Management System) Work

Kode Unit : F.429120.015.01
Mengkaji Dokumen Kontrak
Reviewing Contract Documents

Kode Unit : F.429120.016.01
Membuat Program Kerja dan Metode Kerja
Creating a Work Program and Work Method

Kode Unit : F.429120.017.01
Melaksanakan Pekerjaan Persiapan Konstruksi Dermaga
Carrying out Preparatory Work for Pier Construction

Kode Unit : F.429120.018.01
Mengelola Keuangan dan Sumber Daya Manusia
Managing Finances and Human Resources

Kode Unit : F.429120.019.01
Mengelola Administrasi Teknik
Managing Engineering Administration

Kode Unit : F.429120.020.01
Mengendalikan Pelaksanaan Pekerjaan Tanah
Controlling Work Implementation Land

Kode Unit : F.429120.021.01
Mengendalikan Pelaksanaan Pekerjaan Beton
Controlling Concrete Work Implementation

Kode Unit : F.429120.022.01
Mengendalikan Pelaksanaan Pekerjaan Pemancangan
Controlling the Implementation of Piling Work

Kode Unit : F.429120.023.01
Mengendalikan Pelaksanaan Pekerjaan Asesoris Dermaga
Controlling Work Implementation Pier Accessories

Kode Unit : F.429120.024.01
Melakukan Pengendalian Biaya, Mutu dan Waktu
Implementing Cost, Quality, and Time Control

Kode Unit : F.429120.025.01
Melakukan Proses Serah Terima Pekerjaan
Carrying out the Handover Process of the Work

Kode Unit : F.429120.027.01
Melakukan Supervisi Pelaksanaan Pekerjaan Tanah pada Konstruksi Dermaga
Supervising the Implementation of Earthworks for Pier Construction

Kode Unit : F.429120.028.01
Melakukan Supervisi Pelaksanaan Pekerjaan Beton pada Konstruksi Dermaga
Supervising the Implementation of Concrete Work on the Pier Construction

Kode Unit : F.429120.029.01
Melakukan Supervisi Pelaksanaan Pekerjaan Pemancangan pada Konstruksi Dermaga
Supervising the Implementation of Piling Work on the Pier Construction

Kode Unit : F.429120.030.01
Melakukan Supervisi Pelaksanaan Pekerjaan Asesoris Dermaga
Supervising the Implementation of Dock Accessory Work

Kode Unit : F.429120.031.01
Melakukan Pengawasan Mutu, Kuantitas dan Waktu
Conducting Quality, Quantity, and Time Control

Kode Unit : F.429120.032.01
Mengevaluasi Kinerja Kontraktor
Evaluating Contractor Performance

Kode Unit : F.429120.033.01
Melakukan Pengukuran Bersama untuk Penerbitan Sertifikat Pembayaran
Conducting Joint Measurements for Issuing Payment Certificates

Kode Unit : F.429120.034.01
Membuat Laporan Pekerjaan Supervisi
Creating a Supervisory Work Report

Kode Unit : F.429120.035.01
Melakukan Rekomendasi Penyerahan Akhir Pekerjaan
Making a Recommendation for Handover End of Work

Biaya Uji Kompetensi

Statistik uji kompetensi pada skema ini adalah sebagai berikut.

0

Asesi

0

Sertifikat Terbit

0

Asesor

0

Jadwal Uji Kompetensi

Persyaratan Pemohon Sertifikasi Ahli Utama Teknik Dermaga 114

LSP Konstruksi Asttatindo

Adapun persyaratan pemohon uji kompetensi pada skema ini adalah sebagai berikut.